Cooling Tower Study
15 November 2019 | ZEROGeoengineering.com | Cooling Tower Study Final Report
June 23, 1969 through June 22, 1970 | IIT RESEARCH INSTITUTE
The project was sponsored by the Division of Meteorology, Air Pollution Control Office, Environmental Protection Agency, 3820 Merton Drive, Raleigh North Carolina, 27609.

Link To Full _DOCUMENT_91000A4F












13_November_2019_Limerick Nuclear Plant; Photo S. LePere
Method for weather modification and vapor generator for weather modification
